The 1 Line

Federal Way Downtown – Lynnwood City Center · 27 stations

The 1 Line in numbers

Stations
27Federal Way Downtown – Lynnwood City Center
End to end
75 minto the timetable
Length
59,47 kmof route
Shared stations
14 stationswith another line
Beyond central Seattle
10 of 27the line reaches across the Seattle region

Every station on the 1 Line

In order, from Federal Way Downtown to Lynnwood City Center. Where another line is marked, the lines share the track there.

Federal Way Downtown – Lynnwood City Center

27 stations · 59,5 km · 94 minutes end to end

Pioneer Square2same platform
Symphony2same platform
Westlake2same platform
Capitol Hill2same platform
Univ of Washington2same platform
U District2same platform
Roosevelt2same platform
Northgate2same platform
Pinehurst2same platform
Mountlake Terrace2same platform

Stations, area and shared lines

StationAreaLinesNotes
Federal Way DowntownFederal Way1terminus
Star LakeKent1—
Kent Des MoinesKent1—
Angle LakeSeaTac1—
SeaTac/AirportSeaTac1—
Tukwila Int'l BlvdTukwila1—
Rainier BeachSeattle1—
OthelloSeattle1—
Columbia CitySeattle1—
Mount BakerSeattle1—
Beacon HillSeattle1—
SODOSeattle1—
StadiumSeattle1—
Int'l Dist/ChinatownSeattle1 2shared with 2 Line
Pioneer SquareSeattle1 2shared with 2 Line
SymphonySeattle1 2shared with 2 Line
WestlakeSeattle1 2shared with 2 Line
Capitol HillSeattle1 2shared with 2 Line
Univ of WashingtonSeattle1 2shared with 2 Line
U DistrictSeattle1 2shared with 2 Line
RooseveltSeattle1 2shared with 2 Line
NorthgateSeattle1 2shared with 2 Line
PinehurstSeattle1 2shared with 2 Line
Shoreline South/148thShoreline1 2shared with 2 Line
Shoreline North/185thShoreline1 2shared with 2 Line
Mountlake TerraceMountlake Terrace1 2shared with 2 Line
Lynnwood City CenterLynnwood1 2terminus · shared with 2 Line

Times between stations

What the train takes from one station to the next, from the published timetable. The column adds up to 75 minutes and the whole line takes 75: the two nearly match, because the timetable folds the station stops into the running time rather than listing them apart.

Frequently asked questions about the 1 Line

The 1 Line has 27 stations, from Federal Way Downtown to Lynnwood City Center, over 59,47 km.

Between 73 and 75 minutes, depending on direction. That is the run of the trains that work the whole line, end to end, station stops included.

At 14 stations: Int’l Dist/Chinatown, Pioneer Square, Symphony, Westlake, Capitol Hill, Univ of Washington, U District, Roosevelt, Northgate, Pinehurst, Shoreline South/148th, Shoreline North/185th, Mountlake Terrace and Lynnwood City Center. The 2 Line share the tracks there, so you change by taking the next train.

Beyond the central city: Federal Way, Kent, Lynnwood, Mountlake Terrace, SeaTac, Shoreline and Tukwila.

On weekdays the 1 Line runs from 04:07 to 01:28 somewhere on the line. It varies by station: see the timetable or the station page.

On this page

Fotografia din antet: Aviation404 / Wikimedia Commons (CC BY-SA 4.0)